A clean, tailor-made solar installation, a responsive and professional team, SMA equipment and support from quotation through installation.
Hydropower in Reunion Island.
Experience built on local water infrastructure: energy recovery, operation and maintenance.

2013: the first private hydropower plant in Reunion Island.
On 6 December 2013, ALTERELEC commissioned a plant on the Irrigation du Littoral Ouest network at Head Reservoir No. 4 in L’Ermitage. The system recovers energy from water arriving at approximately 5 bar, energy that had previously been dissipated.
Saint-Paul200 kVAIn operation
Hydropower study, integration or O&M?
Tell us about the network, pressure, flow and operational constraints.